Owner: City Of Austin, Austin Water Utility
Contact: Ms. Teresa Lutes
Title of person named above: Intergrated Water Resources Management
Address of person named above: 625 E. 10th Street, Suite, 700, Austin, TX 78701
Phone number: (512) 972-0179
Completion Date: 2008
Cost: $2 million (Fee)
Project
Description:
The Green Water Treatment Plant (WTP) was constructed in 1924 with an ultimate rated treatment capacity of 45 MGD.
Through its Green WTP Planning Assessment Study, the Austin Water Utility (AWU) has performed a condition assessment of the existing plant and has determined that it is not feasible or cost effective to retrofit the existing Green WTP for long-term reliable use. Therefore, AWU plans to decommission the existing Green WTP in the near-term, once other capacity-related improvements are operational.
The project involves decommissioning the plant facilities, removing appropriate equipment and demolishing structures and other existing land improvements. The project will also require planning, design, bidding to construct utility connections and/or relocations required as a result of the decommissioning and demolition plan, and to the extent possible accommodate possible future site development. Project coordination with redevelopment planning will be on-going throughout the project and may result in City agreed upon adjustments to the Plan.
Services Provided:
CAS is serving as a subconsultant to URS Inc. to provide utility relocation and design streambank stabilization. CAS will provide HEC-RAS analyses of design alternatives for Shoal Creek, storm drain design, construction plans, specifications, an estimate of probable construction cost, a project schedule, and an engineering report.
|