Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in D:\website\htdocs\casengineers.com\wwwroot\wp-content\plugins\revslider\includes\operations.class.php on line 2758

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in D:\website\htdocs\casengineers.com\wwwroot\wp-content\plugins\revslider\includes\operations.class.php on line 2762

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in D:\website\htdocs\casengineers.com\wwwroot\wp-content\plugins\revslider\includes\output.class.php on line 3706
2019 – CAS Consulting & Services, Inc.

CAS Prime Wins

  • 2019 Large Scale W/WW Facilities Rotation List – $3M (Fee)
  • Oltorf Reclaimed Water Main Phase I – Approx. $3.7M Construction Value
  • Watershed Solutions JV (CAS and Miller Gray) awarded 2019 Watershed Protection Flood Risk Reduction Rotation List – $4M (Fee)
  • 2019 Large Diameter Water and Wastewater Pipeline Engineering Rotation List – $1.4M (Fee)
  • 2020 Large Scale General Civil Engineering Services Rotation List – $800K (Fee)
  • Construction Management Service for the W-6 Upper Segment: Highway 90 to SW Military Drive Sewer Main Project – $200M Construction Value